Schedule problem

I have a problem setting the schedule. In the field tags can’t find a single tags, even though I have them with the workers. I’d like to start a flying sheet periodically, however when I fill out everything (I don’t write overclocking and Run Command) I get a error “Missed required fields”

. Does anybody have got a same problem?

1 Like

This topic was automatically closed 416 days after the last reply. New replies are no longer allowed.